Power supply: POE Network cable power supply Measuring Medium: Water |
Pipe size: 1ʺ ~ 24ʺ ( 25mm ~ 600mm ) Flow range: 0.16 ft/s ~ 16 ft/s ( 0.5 m/s ~ 5.0 m/s ) |
D106E Ultrasonic Flow Indicator for Pharmacy
Performance specifications | |
Flow range | 0.16 ft/s ~ 16 ft/s ( 0.5 m/s ~ 5.0 m/s ). |
Pipe Size | 1ʺ ~ 24ʺ ( 25mm ~ 600mm ). |
Fluid | Water. |
Pipe Material | Carbon steel, Stainless steel, PVC, Copper. |
Function specifications | |
Support Protocols | HTTP、MQTT Protocol |
Power supply | POE Network cable power supply |
Keyboard | Touch Keys*16 |
Display | 20×2 lattice alphanumeric, back lit LCD. |
Temperature | Transmitter: 14 °F to 122 °F ( –10℃ ~ 50℃ ); Transducer: 32 °F to 140 °F ( 0℃ ~ 60℃ ). |
Humidity | Up to 99% RH, non-condensing. |
Physical specifications | |
Transmitter | Engineering Plastic (ABS), IP Rating IP65 |
Transducer | Sealed design, protection class IP68 |
Transducer Cable | Standard cable length: 16 ft (5m). |
Weight | Transmitter: approximately 0.6kg; Transducer: approximately 0.5kg. |
Body Parameters

Installation

APPLICATIONS
Water and wastewater management
HVAC (Heating, Ventilation, and Air Conditioning) systems
Process industries (chemical, pharmaceutical, food and beverage)
Energy management and environmental monitoring
Research and development
Facilities management
Industrial maintenance and troubleshooting
Application cases

CERTIFICATE

ABOUT SHIPPING
ABOUT US
1. Gentos Measurement & Control Co, Ltd. was established in 1993.
2. We focus on different types of ultrasonic flow meters almost 30 years.
3. We have our own factory to make exquisite appearance & optimal products.
4. We have 10 to 20 engineering employers to be working on research & development.
5. All our products are designed and manufactured by ourselves.
6. Each department works together to provide best service for our customers as well.
FAQ:
Q1: Do you have stock?
A2: Yes, we have safety inventory. We have a complete production line to meet bulk orders
Q2: How to ensure the quality of your products, will the finished product be inspected?
A2: Yes, every step of production and finished product must be strictly checked by QC before shipment.
Q3: How long is your delivery time?
A3: Lead time about 1-3 days after payment (you can get it in 5-7 days to your door).
Q4: Can you give us a discount?
A4: We can of course talk to specific numbers, but let’s make sure we’re on the same page about this solution being a good fit for your needs.
Q5: Are you a FACTORY or TRADING COMPANY?
A5: Yes,we are a manufacturer with designing, manufacturing, marketing and exporting.